PPR水管连接?
PPR水管连接的方式主要采用的是热熔。在进行热熔连接前,要将管道的的两端上的尘土及污渍清除掉。在用熔接机加热管材的及管材的配件,当管材的极其的管件的热熔深度及时间达到一定的要求后,可进行管材的热熔焊接。?
PPR water pipe connectionThe main connection mode of PPR water pipe is hot melting. Before the hot-melt connection, the dust and stains on both ends of the pipe should be removed. When the welding machine is used to heat pipes and pipe fittings, when the hot-melt profundity and time of pipes and pipe fittings meet certain requirements, the hot-melt welding of pipes can be carried out.
ppr管安装的小窍门·安装完毕后的试压工作,PVC管业代理,试验压力为工作压力的1.5倍,且压力值不得小于0.6MPa,测试时间约20-30分钟。
·管材安装要遵循“水走天”原则,避免后期维护损害管道。
·安装过程中要及时封住管材开口处,避免杂物进入管道系统
Tips for PPR tube installation
·After installation,PVC管业, the test pressure is 1.5 times of the working pressure, and the pressure value shall not be less than 0.6MPa, and the test time is about 20-30 minutes.
·Pipe installation chould follow the principle of 'water goes to the sky' to avoid damage to the pipe during later maintenance.
·In the process of installation,PVC管业品牌, the opening of the pipe should be sealed in time to avoid impurities entering the pipe system
目前,法兰连接中大的问题主要是法兰本身不合格和法兰连接不合格。
现在市场上销售的一些法兰存在的质量问题有:
①法兰的钢材不合格,耐压强度较低,在使用若干个月或若干个年后,出现渗水。
②法兰的螺栓孔外缘距法兰的边缘太小,厦门PVC管业,小于5mm,在螺栓紧固时,易使法兰边缘。
At present, the major problems in flange connection are the unqualified flange itself and the flange connection is unqualified.
Some of the quality problems of the flange sold in the market are as follows:
① The flange steel is unqualified and the pressure resistance is low. After several months or years of use, water seepage occurs.
② The outer edge of bolt hole of flange is too small from the flange edge, less than 5mm. When the bolts are tightened, it is easy to make the flange edge.